When did the Samruddhi Mahamarg reach Igatpuri?
The Bharvir–Igatpuri section opened in March 2024, and the final 76 km Igatpuri–Amane stretch opened on 5 June 2025, completing the 701 km expressway.
The final Igatpuri–Amane stretch opened in June 2025. Here is what it means for anyone thinking about a home in the hills.
With the final Igatpuri–Amane stretch opened on 5 June 2025, the 701 km Samruddhi Mahamarg now links Igatpuri to the Thane region by expressway. Reports at the opening said the stretch cuts the Igatpuri–Amane drive from about 90 minutes to about 40, turning Igatpuri into a realistic Friday-evening drive from Mumbai and Thane.
| Length | 701 km, Nagpur to Amane (Thane district) |
|---|---|
| Lanes | Six |
| Design speed | 150 km/h |
| Igatpuri interchange | Yes |
| Igatpuri tunnel | About 7.8 km through the Kasara ghat region |
| Stage | Opened |
|---|---|
| Nagpur – Shirdi (502 km) | December 2022 |
| Shirdi – Bharvir (80 km) | May 2023 |
| Bharvir – Igatpuri | March 2024 |
| Igatpuri – Amane (76 km) | 5 June 2025 |
Before the final stretch, reaching Igatpuri from Mumbai meant the old Mumbai–Nashik highway and the Kasara ghat climb — a drive that was easy to underestimate on a busy weekend. The new section runs through the ghat region on its own alignment, including a tunnel of about 7.8 km, and connects to Amane near Bhiwandi.
The practical effect is predictability. A second home only works if you actually use it, and you only use it if the drive is easy. Shorter, more reliable drive times are the single biggest change the expressway brings to Igatpuri.

Artist’s impression of the elevated walkway at Fog Cielo.
Better roads don’t guarantee anything about land prices, and buyers should be wary of anyone who says otherwise. What the expressway doesn’t change is what made Igatpuri special in the first place: the altitude, the mist, the forests and the reservoirs. The best plots are still the ones that keep that character while being easy to reach.
Fog Cielo is about 5 minutes from the Samruddhi Mahamarg on the Mumbai–Nashik highway front. The developer estimates about 45 minutes from the Amane interchange and about 90 minutes from Viviana Mall, Thane. See drive times and the estate →
The Bharvir–Igatpuri section opened in March 2024, and the final 76 km Igatpuri–Amane stretch opened on 5 June 2025, completing the 701 km expressway.
701 km, six lanes, from Nagpur to Amane near Bhiwandi in Thane district.
Reports at the opening said it cuts the Igatpuri–Amane journey from about 90 minutes to about 40 minutes.
Yes. The final stretch includes a tunnel of about 7.8 km through the Kasara ghat region, reported as India’s longest road tunnel.
Schedule a private site visit to Fog Cielo. Our team will craft an unhurried tour of the estate and answer everything about ownership.
Your request has reached us. A Fog Cielo consultant will be in touch shortly to arrange your private visit.